Open Access Journal

ISSN : 2394-2320 (Online)

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

Open Access Journal

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

ISSN : 2394-2320 (Online)

Reference :

    1. S. R. Hejazi and S. Saghafian, ―Flowshop-scheduling problemswith makespan criterion: A review,‖ Int. J. Production Res., vol. 43,no. 14, pp. 2895–2929, 2005.
    2. S. Agarwal, S. Kandula, N. Bruno, M.-C. Wu, I. Stoica, and J.Zhou, ―Re-optimizing data-parallel computing,‖ in Proc. 9th USENIX Conf. Netw. Syst. Design Implementation, 2012, p. 21.
    3. P. Agrawal, D. Kifer, and C. Olston, ―Scheduling shared scans oflarge data files,‖ Proc. VLDB Endow., vol. 1, no. 1, pp. 958–969,Aug. 2008.
    4. W. Cirne and F. Berman, ―When the herd is smart: Aggregatebehavior in the selection of job request,‖ IEEE Trans. Parallel Distrib. Syst., vol. 14, no. 2, pp. 181–192, Feb. 2003.
    5. T. Condie, N. Conway, P. Alvaro, J. M. Hellerstein, K. Elmeleegy,and R. Sears, ―Mapreduce online,‖ in Proc. 7th USENIX Conf.Netw. Syst. Design Implementation, 2010, p. 21.
    6. J. Dean and S. Ghemawat, ―Mapreduce: Simplified data processing on large clusters,‖ in Proc. 6th Conf. Symp. Oper. Syst. DesignImplementation, 2004, vol. 6, p. 10.
    7. J. Dittrich, J.-A.-Quiane Ruiz, A. Jindal, Y. Kargin, V. Setty, and J.Schad, ―adoop++: Making a yellow elephant run like a cheetah(without it even noticing),‖ Proc. VLDB Endowment, vol. 3,nos. 1–2, pp. 515–529, Sep. 2010.
    8. P.-F. Dutot, L. Eyraud, G. Mounie, and D. Trystram, ―Bi-criteriaalgorithm for scheduling jobs on cluster platforms,‖ in Proc. 16thAnnu. ACM Symp. Parallelism Algorithms Archit., 2004, pp. 125–132.
    9. P.-F. Dutot, G.Mounie, and D. Trystram,―Scheduling paralleltasks: Approximation algorithms,‖ in Handbo ok of Scheduling:Algorithms, Models, and Performance Analysis, J. T. Leung, Ed. BocaRaton, FL, USA: CRC Press, ch. 26, pp. 26-1–26-24.
    10. J. Gupta, A. Hariri, and C. Potts, ―Scheduling a twostage hybridflow shop with parallel machines at the first stage,‖ Ann. Oper.Res., vol. 69, pp. 171–191, 1997.

Recent Article