Open Access Journal

ISSN : 2394-2320 (Online)

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

Open Access Journal

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

ISSN : 2394-2320 (Online)

Non-Dominating Alternate Path of Bi-objective Fuzzy Assignment Problem

Author : S.Andal 1 S.Murugesan 2

Date of Publication :23rd March 2018

Abstract: In this paper, we present a new algorithm to obtain the non-dominating alternative assignment path of multi objective fuzzy assignment. This method did not need any parameters or node to solve the problem and successfully goes to solving multi objective assignment problem into bi-objective assignment problem. Moreover, it gives the best alternative assignment path. But due to the situation the assignment parameters are uncertain. So, we consider the assignment parameters are fuzzy numbers. A numerical example has been illustrated

Reference :

    1. Abel Garcia-Najera and John A. Bullinaria “Biobjective Optimization for the Vehicle Routing Problem with Time Windows: Using Route Similarity to Enhance Performance “ 1- 15
    2. Afshar, A., Kaveh, A. and Shoghli, O.R. (2007) Multi objective Optimization of Time-Cost-Quality Using Multi-Colony ant Algorithm. Asian Journal of civil Engineering (Building and Housing), 8, 113-124
    3. Anthony Przybylski, Xavier Gandibleuxa, Matthias Ehrgott, A two phase method for multi-objective integer programming and its application to the assignment problem with three objectives, Discrete Optimization 7(2010) 149-165.
    4. Belacela, N. and Boulasselb, M. R. 2001. Multi criteria fuzzy assignment problem: a useful tool to assist medical diagnosis. Artificial intelligence in Medicine 21, 201-207.
    5. Bowen, P.A., Hall, K.A., Edwards, P.J., Pearl, R.G. and Cattell, K.S. (2002) Perceptions of Time, Cost, Quality Management on Building Projects. The Australian Journal of Construction Economics and Building, 2, 48-56

Recent Article